Midland, Texas · Facility overview
Colocation &
network infrastructure.
Facility characteristics, power infrastructure, connectivity, and expansion planning for carriers, network operators, and enterprise customers.
BBT’s Midland location supports regional equipment deployments, interconnection, and on-site technical assistance.

Building & systems
Facility specifications
Existing capacity and expansion figures reflect BBT’s latest project update. Equipment and space details below reference the supplied facility specification sheet. Confirm current availability and engineering requirements for your deployment.
| Location | Midland, Texas |
|---|---|
| Existing building capacity | 500 kW (0.5 MW). Contact BBT for currently available capacity and allocation. |
| Expansion planning | Expansion to 2.5 MW is planned; this is not stated as currently available capacity. |
| White space | 2,400 sq. ft., as listed in the facility specification sheet. |
| Rack infrastructure | 68 data center racks and 13 meet-me room (MMR) racks listed in the specification sheet. These are facility counts, not vacant-rack availability. |
| Fiber access | Multiple fiber entries. BBT currently reports eight entries; the configuration may expand. |
| Backup generation | Dual backup generators. The facility sheet identifies two Caterpillar C18 generators and lists “600 kW +1” generator capacity. |
| UPS equipment | The facility sheet lists “400 kVA +1” UPS capacity using five Eaton 93PM 80 kVA +1 units. Confirm the configured operating capacity and redundancy with BBT. |
| Cooling equipment | The facility sheet lists “90 ton +1” mechanical capacity using four 30-ton Liebert DSE systems. |
| Tower | 120-foot tower listed in the facility sheet. Discuss use and availability with BBT. |
| Space options | Multi-tenant infrastructure and private suites; availability and configuration confirmed by BBT. |
Power infrastructure
Generation, UPS, and cooling
The facility combines dual backup generators with UPS and mechanical systems. Equipment ratings describe different parts of that infrastructure and should not be treated as interchangeable measures of customer-usable power.
Dual backup generators
Two Caterpillar C18 units are identified in the facility documentation. Request the current electrical configuration, operating sequence, and supported load for your proposed deployment.
UPS-supported infrastructure
Eaton 93PM equipment is listed in the facility sheet. Discuss UPS allocation, rack-level delivery, maintenance arrangements, and any A/B feed requirements with the BBT team.
Mechanical systems
Liebert DSE equipment is listed for facility cooling. Discuss rack density, equipment heat load, airflow, and cooling allocation before finalizing a deployment.
For redundancy details, request the current power configuration from BBT. The source sheet uses “+1” equipment-capacity notation; the precise system topology should be confirmed for each proposed deployment.
Carrier-neutral connectivity
Multiple fiber entries.
Regional network access.
BBT reports eight fiber entries today, with the potential for additional entries as the site develops. Entry count is separate from the number of active carriers or physically diverse routes.
Networks identified in the fiber-layout reference
- BBT
- AT&T
- Cable One / Sparklight
- Westex
- FBL
The July 26, 2021 layout identifies these five network names. It is a historical infrastructure reference, not a verified current list of active on-site carriers. Contact BBT for the current carrier roster, connection availability, route diversity, and cross-connect options.
Interconnection
Discuss your preferred provider, handoff type, bandwidth needs, and meet-me room requirements.
Private transport
Review dedicated connectivity between your sites, network partners, and other destinations served by BBT’s regional infrastructure.
Network services
Discuss design, implementation, and management requirements alongside fiber and broadband options.
Property & development
Existing site and planned expansion
500 kW building
The current building provides the starting point for BBT’s Midland colocation infrastructure. Available space and power are confirmed directly with the team.
Additional land
BBT has acquired an additional lot to support future development. Survey work is being coordinated as part of site planning.
Second building
Design and planning efforts include a second building and expansion to 2.5 MW. Final scope, phasing, and delivery dates remain subject to project development.

Contact BBT to discuss future capacity needs and request the latest available site information. Planned capacity is separate from capacity available for immediate deployment.
Facility reference materials
Layout & architectural views
Review the supplied fiber-layout reference and architectural renderings alongside the facility specifications. For deployment decisions, request current drawings and configuration details from BBT.

View full size (opens a new tab)

View full size (opens a new tab)

View full size (opens a new tab)
These reference images are not identified as final plans for the proposed second building. Expansion scope, current site conditions, and engineering details should be confirmed directly with BBT.
Deployment & operations
Information for prospective customers
Space and technical support
Discuss private suites, multi-tenant space, equipment installation requirements, and Remote Hands support. BBT can review the scope and availability of on-site assistance for your equipment.
For disaster-recovery deployments, review connectivity, power, space, and operational requirements as part of your organization’s continuity plan.
Prepare your requirements
- Rack quantity, dimensions, weight, and target installation date.
- Initial power load, expected growth, voltage, and feed requirements.
- Preferred carriers, bandwidth, handoffs, and cross-connects.
- Cooling load and equipment airflow requirements.
- Physical access, support coverage, and security requirements.
- Compliance documentation and service-level requirements.
Technical questions to discuss with BBT
How much space and power are available today?
Facility totals are not the same as unallocated capacity. Request current rack, suite, and power availability for your deployment date.
What redundancy and power delivery are provided?
Request the current electrical configuration, UPS and generator arrangements, supported load, rack-level feeds, and maintenance procedures. Confirm any required redundancy designation with BBT’s technical team.
Which carriers can serve my deployment?
Request the current on-site carrier list, available connections, cross-connect details, lead times, and route-diversity information. Historical fiber drawings do not establish current commercial availability.
What security, certifications, and service levels apply?
Ask BBT for current documentation addressing access controls, monitoring, applicable certifications, response coverage, and contractual service levels. Requirements should be reviewed against your organization’s policies.
When will expansion capacity be available?
The second building and expansion to 2.5 MW are in planning. Discuss your schedule with BBT for the latest project status; no completion date is stated in this overview.
Technical & commercial inquiries
Request a facility discussion.
Contact a BBT Business Solutions Expert for current specifications, carrier availability, deployment planning, and expansion information.